Hydrogen generation system, power generation system, hydrogen generation method, and power generation method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11939217
APP PUB NO 20210139324A1
SERIAL NO

17151048

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, a magnesium-recycling hydrogen generation system includes: a by-product acquisition unit that separates a by-product from a post-reaction solution, which is a solution after reacting with a hydrogen generation material containing a hydrogen-containing magnesium compound that generates hydrogen via a reaction with the solution, to acquire the by-product including more than one type of oxygen-containing magnesium compound that contains oxygen produced by the reaction, a raw material production unit that reacts the by-product with a halogen-containing substance containing halogen and other atoms than the halogen to produce a raw material containing magnesium halide, a hydrogen generation material production unit that reduces the raw material with plasma containing hydrogen to produce the hydrogen generation material, and a hydrogen generator that reacts the hydrogen generation material with the solution to generate hydrogen.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SE CORPORATIONTOKYO 163-1343

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Morimoto, Mineo Tokyo, JP 2 1
Oishi, Toshihiro Tokyo, JP 2 10
Sakamoto, Yuichi Tachikawa, JP 27 142
Sawaki, Yoshiharu Tokyo, JP 1 0
Takizawa, Tsutomu Tokyo, JP 7 28

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00