Multi-speed hub gear

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11518476
APP PUB NO 20210155319A1
SERIAL NO

17104219

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-speed hub gear includes an axle, a planetary gear set, a clutch, a transmission member, a guide wheel, a compressed clutch spring, a shift mechanism and a torsional spring. While in switching a low gear to a high gear, the shift mechanism transforms a rotational motion into a linear motion for twisting the torsional spring. The compressed clutch spring pushes the clutch to displace from the transmission member toward the planetary gear set. While in switching the high gear to the low gear, the torsional spring drives the shift mechanism to transform the rotational motion into the linear motion, such that the clutch can displace from the planetary gear set toward the transmission member, and compress the compressed clutch spring.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SUN RACE STURMEY-ARCHER INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Chia-Sheng Taoyuan, TW 16 32
Su, Hsing-Yang Taoyuan, TW 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00