Silicate-emulsion primer and paint

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11680170
APP PUB NO 20210230431A1
SERIAL NO

16775662

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An emulsion composition includes an acrylic polymer, a metal silicate, and water. Advantageously, the emulsion composition provides coatings with superior adhesion of coatings to a concrete, clay, or ceramic substrate. In particular, the emulsion composition provides improved adhesion of the silicate primer to the concrete, clay, or ceramic substrate and strong cohesion between the primer and top coat paint allow for a much better overall performance. A method for applying the emulsion composition is also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BEHR PROCESS CORPORATION1801 E ST ANDREW PLACE SANTA ANA CA 92705

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Crowe, Jonathan William Santa Ana, US 1 0
Datta, Promita West Bengal, IN 1 0
Hentschel, Jens Orange, US 3 3
Ruiz, David Anthony Ontario, US 1 0
Williams, Gregory Allen Laguna Beach, US 9 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00