Crude stabilizer bypass

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11459511
APP PUB NO 20210317371A1
SERIAL NO

16844716

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method to remove gas, water, and salt from crude oil via a GOSP train and discharging the crude oil from a desalter vessel of the GOSP train as unstabilized crude oil to a stabilizer distillation column, removing gas from the unstabilized crude oil via the stabilizer distillation column to reduce vapor pressure of the unstabilized crude oil to give stabilized crude oil, and diverting a bypass portion of the unstabilized crude oil discharged from the desalter vessel to the stabilized crude oil downstream of the stabilizer distillation column.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANYDHAHRAN 31311

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
AlShammari, Abdulrahman M Dhahran, SA 1 0
Hajji, Ali T Al-Ahsa, SA 2 0
Jubran, Mustafa A Dhahran, SA 2 0
Khan, K A Ashiff Dhahran, SA 1 0
Wosaifer, Abdulmohsen K Dhahran, SA 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 4, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 4, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00