Reactor for continuously treating polymeric material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11739191
APP PUB NO 20210324172A1
SERIAL NO

17361329

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for continuously treating recycled polymeric material includes a hopper configured to feed the recycled polymeric material into the system. An extruder can turn the recycled polymeric material in a molten material. In some embodiments, the extruder uses thermal fluids, electric heaters, and/or a separate heater. The molten material is depolymerized in a reactor. In some embodiments, a catalyst is used to aid in depolymerizing the material. In certain embodiments, the catalyst is contained in a permeable container. The depolymerized molten material can then be cooled via a heat exchanger. In some embodiments, multiple reactors are used. In certain embodiments, these reactors are connected in series. In some embodiments, the reactor(s) contain removable static mixer(s) and/or removable annular inserts.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GREENMANTRA RECYCLING TECHNOLOGIES LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Di, Mondo Domenic Brantford, CA 21 17
Gil, Amalia Brantford, CA 6 19
Rybicki, Radek Brantford, CA 6 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00