Vessel for containing direct reduced iron

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11859907
APP PUB NO 20210333048A1
SERIAL NO

17299957

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vessel for containing direct reduced iron (DRI), such as a reactor for the production of DRI, a bin or a hopper or other container for storing or feeding DRI to melting furnaces or briquetting machines, includes at least an upper zone, defined by a first lateral wall having a substantially cylindrical tubular shape, and a discharge zone, positioned below the upper zone and defined by a second lateral wall having a substantially truncated cone shape converging toward a lower discharge aperture. The second lateral wall has an internal surface at least partly lined by an internal lining.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DANIELI & C OFFICINE MECCANICHE SPA33042 BUTTRIO
HYL TECHNOLOGIES S A DE C VN L 66450

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Della, Negra Angelico Povoletto, IT 16 31
Freschi, Federico Udine, IT 1 0
Guerra, Reyes Maria Teresa Monterrey, MX 2 0
Zampa, Massimiliano Udine, IT 5 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00