Garden shears

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11497173
APP PUB NO 20220210980A1
SERIAL NO

17143538

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A garden shears has a first cutting member, a second cutting member and a protecting member. The first cutting member and the second cutting member are combined adjacent to each other, and the first cutting member and the second cutting member respectively have a blade portion facing the blade portion of the other cutting member. The blades of the first cutting member and the second cutting member are used for opposite positioning cutting, instead of staggered cutting after closing, which can avoid the formation of two different cut surfaces on both sides of the branches. The protecting member has a securing aperture and an arced slot, and the securing aperture is a polygonal aperture with multiple engaging edges.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JIIN HAUR INDUSTRIAL CO LTDNO 133 JIUGANG LN DINGCUO VIL LUGANG TOWNSHIP CHANGHUA COUNTY 50545

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wu, Shih-Piao Chang Hua Hsien, TW 74 573

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 15, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 15, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 15, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00