Systems and methods for separating hydrocarbons with substantially reduced emissions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11697774
APP PUB NO 20220235277A1
SERIAL NO

17157521

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A modular crude oil refinery (MCOR) is designed for smaller scale deployment with a capacity to process in the range of 3,000-4,000 barrels of crude oil per day in a single production unit and with the potential to scale to over 100,000 barrels per day with linked production units. More specifically, a MCOR includes a low temperature, low pressure primary separation reactor, condensing system and recirculation systems operating in a closed loop configuration that enable the production of both heavy and light hydrocarbon products with substantially no emissions. The MCOR has the capability to receive and process crude-oil feedstocks of varying API gravity and be controlled to produce a variety of both heavy and light products including cleaner-burning bunker fuels, jet fuels, diesel fuels, gasoline fuels and asphalt binders.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DESIGNER FUELS LLC440 EASTON DRIVE SUITE 9 BAKERSFIELD CA 93309

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Diorio, Darin Wytheville, US 3 0
Snider, George E Hardeeville, US 4 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 11, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 11, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 11, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00