Pump stage assembly, external gear pump, use of a pump stage assembly and vehicle transmission

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12049951
APP PUB NO 20220243803A1
SERIAL NO

17620310

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pump stage assembly for supplying lubricating oil, comprising: at least two pump suction stages and at least one pump pressure stage. The pump suction stages and the pump pressure stage are spaced apart from one another in a pump housing PG and have a common drive shaft. The pump suction stages are formed by a first assembly of at least three intermeshing external gearwheels and wherein the pump pressure stage is formed by a second assembly of two intermeshing external gearwheels. Here at least two respective tooth center points of the first external gearwheel assembly and the respective tooth center points of the second external gearwheel assembly are arranged in a common plane E-E which intersects the pump housing PG in a longitudinal direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VITESCO TECHNOLOGIES GMBH93055 REGENSBURG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Böhm, Christian Munich, DE 12 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 30, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 30, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 30, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00