Automatic bucking tool

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11825782
APP PUB NO 20220369565A1
SERIAL NO

17374594

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electric trimmer has an electric motor and power source, a pair of blade plates, at least one of which is connected to an oscillator mechanism in the electric motor, and a pair of guard plates disposed one on each side of the at least one of the pair of blade plates, the guard plates hosting a matching radial or linear pattern of slots having a uniform spacing, a uniform slot width, the slots breaking out past at least one edge of the guard plates, the guard plates, in assembly, creating a gap space there between. One or more operators may insert branches having buds or flowers thereon through any one of the matching slots in the slot pattern, the branch oriented orthogonal to the blade set with the blade plates oscillating to harvest the buds or flowers within the gap space.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STANTON MARKLAYTONVILLE CA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Stanton, Mark Laytonville, US 8 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00