Pyrolysis reactor system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11981866
APP PUB NO 20220403248A1
SERIAL NO

17822026

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for the pyrolysis of a pyrolysis feedstock utilizes a pyrolysis reactor for producing pyrolysis products from the pyrolysis feedstock to be pyrolyzed. An eductor condenser unit in fluid communication with the pyrolysis reactor is used to condense pyrolysis gases. The eductor condenser unit has an eductor assembly having an eductor body that defines a first flow path with a venturi restriction disposed therein for receiving a pressurized coolant fluid and a second flow path for receiving pyrolysis gases from the pyrolysis reactor. The second flow path intersects the first flow path so that the received pyrolysis gases are combined with the coolant fluid. The eductor body has a discharge to allow the combined coolant fluid and pyrolysis gases to be discharged together from the eductor. A mixing chamber in fluid communication with the discharge of the eductor to facilitates mixing of the combined coolant fluid and pyrolysis gases, wherein at least a portion of the pyrolysis gases are condensed within the mixing chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DUKE TECHNOLOGIES LLC2434 DEANE SOLOMON FAYETTEVILLE AZ 72704

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ackerson, Michael D Fayetteville, US 32 499
Byars, Michael Steven Fayetteville, US 24 263

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00