Arrangement for and a method of operating a steam boiler system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11850550
APP PUB NO 20230016404A1
SERIAL NO

17786258

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of operating and an arrangement for a steam boiler system including a furnace and along a following flue gas channel a number of superheaters, a number of economizers, and at least one air preheater located in the flue gas channel downstream of the economizers, a fabric filter baghouse located in the flue gas channel downstream of the air preheater, and downstream of the fabric filter baghouse is located a selective catalytic reduction (SCR) system including an SCR reactor, a high pressure steam coil heater upstream of the SCR reactor and a gas-gas heat exchanger connected upstream and downstream of the SCR reactor to transfer heat from flue gas after the SCR reactor to the flue gas upstream of the high pressure steam coil heater.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO SHI FW ENERGIA OY02130 ESPOO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rokka, Antti Espoo, FI 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00