Energy conversion system for converting wind energy into electrical energy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11976624
APP PUB NO 20230021115A1
SERIAL NO

17855023

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An energy conversion system for converting wind energy into electrical energy includes at least one rotor having a substantially horizontal rotational axis and a plurality of rotor blades extending radially with respect to the rotational axis; a rotor mantle which fully surrounds the rotor; a plurality of wind funnels, including a first wind funnel arranged upstream of the rotor mantle and tapering towards the rotor mantle, and a second wind funnel arranged downstream of the rotor mantle and widening in a direction leading away from the rotor mantle; and a fixed frame which supports the rotor mantle and/or the plurality of wind funnels, wherein at least one adjustment device is provided, which is arranged and configured to orient the energy conversion system in a position corresponding to a prevailing wind direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IMMIG MARIO55543 BAD KREUZNACH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Immig, Mario Bad Kreuznach, DE 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 7, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 7, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 7, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00