Takeoff performance alert

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11846944
APP PUB NO 20230251654A1
SERIAL NO

17650464

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An aircraft includes at least one line replaceable unit (LRU) configured to determine, based on initial data collected prior to a takeoff roll of the aircraft, a takeoff rotation speed of the aircraft and a rotation time associated with the takeoff rotation speed. The LRU is configured to determine, during the takeoff roll and prior to the rotation time, a predicted speed of the aircraft at the rotation time. The predicted speed is at least partially based on data collected during the takeoff roll. The LRU is also configured to determine whether an alert condition is satisfied at least partially based on whether a disparity between the takeoff rotation speed and the predicted speed exceeds a rotation speed disparity threshold and to generate a takeoff performance alert in response to the alert condition being satisfied.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY929 LONG BRIDGE DRIVE ARLINGTON VA 22202

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barhoum, Erek S Mukilteo, US 1 0
Godwin, Ross Kirkland, US 1 0
Poteet, Paul E Seattle, US 1 0
Radfar, Hamid Reza Kirkland, US 1 0
Shipway, John Richard Edmonds, US 1 0
Tang, Hien M Sammamish, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00