English Title Not Available

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12024782
APP PUB NO 20230366104A1
SERIAL NO

18354435

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to the production of graphene from CO2 through electrolysis and exfoliation processes. One embodiment is a method for producing graphene comprising (i) performing electrolysis between an electrolysis anode and an electrolysis cathode in a molten carbonate electrolyte to generate carbon nanomaterial on the cathode, and (ii) electrochemically exfoliating the carbon nanomaterial from a second anode to produce graphene. The exfoliating step produces graphene in high yield than thicker, conventional graphite exfoliation reactions. CO2 can be the sole reactant used to produce the valuable product as graphene. This can incentivize utilization of CO2, and unlike alternative products made from CO2 such as carbon monoxide or other fuels such as methane, use of the graphene product does not release this greenhouse gas back into the atmosphere.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
C2CNT LLC625 WEST VENICE AVENUE VENICE FL 34285

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Licht, Stuart Venice, US 80 589

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 2, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 2, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00