Bracket structure and method of using the bracket structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11986118
APP PUB NO 20230404311A1
SERIAL NO

17842739

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bracket structure and a method of using the bracket structure are provided. The bracket structure includes a bracket body and a locking plate. The top plate and the rear plate of the bracket body respectively form an upper hook portion and a lower hook portion. The locking plate is movably disposed on the top plate of the bracket body. The locking plate has a locking plate body and a control part, and the locking plate body has a first and a second pressing abutting portion. The upper track is placed between the top plate and the rear plate, so that the bottom of the upper track is placed on the lower hook portion, and the first hook portion of the upper track and the upper hook portion of the bracket body are hooked to each other to temporarily fix the upper track on the bracket structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAN HSIN PLASTECH CO LTDNO 17 JIANGUO E RD TAOYUAN DIST TAOYUAN CITY 330

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Shu-Yuan Taoyuan, TW 5 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00