Sanitization of an article using in situ electrolysis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12070523
APP PUB NO 20240000984A1
SERIAL NO

17856408

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system, comprising: a chlorine source in form of an electrolysis unit to generate an in-situ generated active chlorine; wherein a concentration of perchlorate is not more than half of a concentration of chlorate; and pH of a fluid containing in-situ generated active chlorine is more than 7.4; a buffer tank to store a concentrate of in-situ generated active chlorine as a free available chlorine (FAC); a fluid distribution system to supply FAC in form of an in-use fluid to the cabinet; wherein the system is configured to clean and disinfect an article with the fluid while complying with national and international standards for food safety, operator's safety and regulatory requirements regarding the use of biocides.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
APPLIED BIOCIDE GMBHSIEMENSSTRASSE 42 BÖNEN 59199

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fink, Michael Santa Clara, US 41 1951

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 27, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 27, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00