JIG TOOL SET FOR CONSTRUCTING CEILING ANCHOR BOLT AND INSTALLING FULL THREAD BOLT AND METHOD OF CONSTRUCTING FULL THREAD BOLT USING SAME

Number of patents in Portfolio can not be more than 2000

United States of America Patent

APP PUB NO 20240009888A1
SERIAL NO

18253714

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A jig tool set for constructing a full thread bolt, and a method of constructing a full thread bolt using the jig tool set. The jig tool set includes a drill bit, a connecting rod, an anchor bolt set, a full thread bolt, and a drill gun. The drill bit includes a drilling part to secure a hole by drilling a ceiling slab made of concrete at one end. The anchor bolt set is fixed to the hole formed in the ceiling slab through the drill bit and configured to form the full thread bolt in the ceiling slab. The connecting rod has a certain length so that, as the drill bit and the anchor bolt set are sequentially seated at one end thereof. A drill gun is formed at the other end of the connecting rod and configured to provide a rotational force and a hitting force.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEOUL FASTENING CO LTD#111 SIHEUNG-DAERO GEUMCHEON-GU SEOUL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
SONG, Yun Ku Seoul, KR 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation