Debris flow anti-collision device with high-speed water curtain for mountain bridge

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12071734
APP PUB NO 20240068184A1
SERIAL NO

17953696

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a debris flow anti-collision device with a high-speed water curtain for a mountain bridge. A pressurizer is fixedly installed in a groove of a base; the pressurizer is communicated with high-speed water curtain spray pipe components, and each high-speed water curtain spray pipe component penetrates through a side wall of the base and communicates with an outside; the base rotates with several groups of spoilers, an outer side of the base is fixedly provided with several groups of energy dissipation components, and a connecting bar is detachably connected between each group of energy dissipation components and the base; rear ends of the base are detachably connected with baffles; and the pressurizer is communicated with a water storage tank.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WEST CHINA NORMAL UNIVERSITYNO 1 SHIDA ROAD SHUNQING DISTRICT NANCHONG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Hongkai Zaozhuang, CN 5 0
Chu, Chunchao Zaozhuang, CN 1 0
Huang, Yongfa Zaozhuang, CN 1 0
Jiao, Pengpeng Zaozhuang, CN 1 0
Peng, Hui Zaozhuang, CN 55 178
Wang, Quancai Zaozhuang, CN 2 0
Wang, Shengjuan Zaozhuang, CN 4 10
Wang, Xianjin Zaozhuang, CN 7 0
Wang, Xin Zaozhuang, CN 1487 14353

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 27, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 27, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00