Expert system scheduler

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 5040123
SERIAL NO

07405692

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An expert system scheduler is disclosed which uses heuristics developed by an experienced factory scheduler. The scheduler uses these heuristics to generate schedules. Forward and backward scheduling is used at different stages of the schedule generation process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddressTotal Patents
GENERAL MOTORS CORPORATIONDETROIT, MI145

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barber, Karon A Bloomfield Hills, MI 2 109
Burridge, Kenneth L Clearwater, FL 1 63
Osterfeld, David H Birmingham, MI 1 63

Cited Art Landscape

Patent Info (Count) # Cites Year
 
GENERAL ELECTRIC COMPANY (1)
* 4896269 Job shop scheduling and production method and apparatus 87 1988
 
Other [Check patent profile for assignment information] (2)
* 4648023 Method for resource allocation for the manufacture of a product 55 1986
* 4796194 Real world modeling and control process 182 1986
 
BELL TELEPHONE LABORATORIES, INCORPORATED (1)
* 4807108 Product realization method 59 1987
 
HITACHI, LTD. (1)
* 4852001 Job scheduling method and system 137 1987
* Cited By Examiner

Patent Citation Ranking

Forward Cite Landscape

Patent Info (Count) # Cites Year
 
SONY CORPORATION (2)
* 8996440 Information processing apparatus, information processing method, and program 0 2012
* 2012/0310,873 INFORMATION PROCESSING APPARATUS, INFORMATION PROCESSING METHOD, AND PROGRAM 1 2012
 
Symmetrix, Inc. (1)
* 5233533 Scheduling method and apparatus 146 1989
 
TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY, LTD. (2)
* 2005/0203,788 System and method for capacity management 1 2004
* 2005/0203,655 Scheduling system and method for avoiding low equipment utilization 4 2004
 
SAMSUNG ELECTRONICS CO., LTD. (1)
* 5523960 Evaluation method of assembly sequences 13 1994
 
SINGAPORE COMPUTER SYSTEMS LIMITED (1)
* 5432887 Neural network system and method for factory floor scheduling 39 1993
 
HITACHI, LTD. (1)
* 5513356 Information processing system for obtaining desired processing based upon output specifications input by user 10 1991
 
Kinaxis Holdings Inc. (3)
* 2006/0026,052 Scheduling system 15 2005
* 7945466 Scheduling system 5 2009
* 2009/0171,742 SCHEDULING SYSTEM 2 2009
 
VENTANA MEDICAL SYSTEMS, INC. (9)
6594537 Automated tissue assay using standardized chemicals and packages 81 1998
7270785 Automated molecular pathology apparatus having fixed slide platforms 34 2002
7303725 Automated high volume slide staining system 55 2003
7378055 Automated molecular pathology apparatus having fixed slide platforms 50 2003
7468161 Automated high volume slide processing system 35 2005
8663991 Automated high volume slide processing system 1 2005
7404927 Automated molecular pathology apparatus having fixed slide platforms 31 2005
8048373 Automated high volume slide staining system 4 2007
9528918 Automated high volume slide processing system 0 2013
 
SIEMENS PRODUCT LIFECYCLE MANAGEMENT SOFTWARE INC. (1)
* 2008/0103,735 SYSTEM AND METHOD FOR DEFINING THE FREQUENCY OF PRODUCT MAINTENANCE 0 2006
 
INCONTACT, INC. (1)
* 8209207 Broad-based incremental training sessions for company representatives in contact handling systems 17 2008
 
IEX CORPORATION (2)
* 5911134 Method for planning, scheduling and managing personnel 164 1990
* 5289368 Force management system user interface 93 1990
 
MICROSOFT TECHNOLOGY LICENSING, LLC (1)
* 2009/0287,523 SHOWING AND CORRECTING IRREGULARITIES IN A SCHEDULE 1 2008
 
TCLOGIC, LLC (1)
* 2005/0075,949 Method and system for analyzing and planning an inventory 33 2001
 
GOOGLE TECHNOLOGY HOLDINGS LLC (1)
* 6625636 Job protection within a distributed processing system having subsystem downtime 18 1999
 
TOYOTA JIDOSHA KABUSHIKI KAISHA (2)
* 5913200 System for and method of working out production start plans 3 1996
* 6711449 Ordered product delivery date management system for management product or part production slot exchange 7 2000
 
HEWLETT-PACKARD INDIGO B.V. (3)
* 9170758 Automatic load balancer for presses 1 2012
* 2013/0286,430 Automatic load balancer for presses 2 2012
* 9760325 Automatic load balancer for presses 0 2015
 
SCENARIO DESIGN, LLC (1)
* 2010/0241,471 INTEGRATION SYSTEM SUPPORTING DIMENSIONED MODELING SYSTEM 5 2009
 
INTERNATIONAL BUSINESS MACHINES CORPORATION (10)
* 5212791 Dynamic scheduling 68 1992
* 6336101 Tracking of computer components allocated during configuration of computer systems and networks by a simplified user friendly configuration process 19 1998
* 7814490 Apparatus and methods for performing computer system maintenance and notification activities in an opportunistic manner 3 2005
* 2006/0101,400 Apparatus and methods for performing computer system maintenance and notification activities in an opportunistic manner 15 2005
* 8615416 Method for avoiding or limiting early build due to yield decreases 3 2006
* 2007/0203,773 METHOD FOR AVOIDING OR LIMITING EARLY BUILD DUE TO YIELD DECREASES 1 2006
8370840 Apparatus and methods for performing computer system maintenance and notification activities in an opportunistic manner 1 2008
* 8290606 Controlled cancellation for production flow and physical assets 0 2008
* 2009/0299,508 CONTROLLED CANCELLATION FOR PRODUCTION FLOW AND PHYSICAL ASSETS 0 2008
8959521 Apparatus and methods for performing computer system maintenance and notification activities in an opportunistic manner 0 2012
 
ADVANCED MICRO DEVICES, INC. (2)
* 7120511 Method and system for scheduling maintenance procedures based upon workload distribution 9 2004
* 2008/0275,582 Scheduling AMHS pickup and delivery ahead of schedule 6 2004
 
AMERICAN POWER CONVERSION CORPORATION (2)
* 7275169 Graphical view of shutdown process 3 2003
* 2005/0097,374 Graphical view of shutdown process 3 2003
 
MCKINSEY & COMPANY, INC. (1)
* 5285392 Parallel manufacturing system 25 1991
 
SAP SE (4)
* 7310561 Identifying critical operations of a production process 1 2005
* 8533023 Systems, methods and computer program products for compact scheduling 0 2005
* 2006/0143,063 Systems, methods and computer program products for compact scheduling 5 2005
* 7805326 System to resolve scheduling constraints 1 2006
 
HON HAI PRECISION INDUSTRY CO., LTD. (1)
* 2004/0117,227 Production capability simulating system and method 13 2003
 
GLOBALFOUNDRIES INC. (1)
* 2003/0225,474 Specialization of active software agents in an automated manufacturing environment 19 2002
 
W.W. Grainger (1)
7324966 Method for fulfilling an order in an integrated supply chain management system 83 2001
 
I-Factory Inc. (3)
* 7715936 System and method for the production of goods or products 3 2007
* 2008/0077,266 SYSTEM AND METHOD FOR THE PRODUCTION OF GOODS OR PRODUCTS 2 2007
* 2010/0222,910 System and Method for the Production of Goods or Products 1 2010
 
GREENFIELD DIVERSIFIED, LLC (1)
* 5737227 Software planning program for coatings 25 1996
 
DELL PRODUCTS L.P. (7)
7577577 Pull to customer order demand fulfillment system and method 1 2001
7346530 Flexible ordering of inventory from material sources according to material requirements for manufacturing operations 4 2001
* 2002/0103,690 Pull to customer order demand fulfillment system and method 7 2001
* 2002/0103,726 Flexible ordering of inventory from material sources according to material requirements for manufacturing operations 1 2001
7379905 Automated data warehouse for demand fulfillment system 5 2001
* 2003/0233,264 Manufacturing order scheduling and materials replenishment system 9 2002
* 2004/0117,230 Recalculating planned requests 3 2002
 
DADE CHEMISTRY SYSTEMS INC. (1)
* 5819232 Method and apparatus for inventory control of a manufacturing or distribution process 156 1996
 
SHIMIZU CONSTRUCTION CO., LTD. (1)
* 5329444 Work management system employing electronic board 14 1992
 
MITSUBISHI HITACHI POWER SYSTEMS, LTD. (2)
* 7286966 Rotation planning apparatus and rotation planning system 1 2003
* 2003/0187,530 Rotation planning apparatus and rotation planning system 0 2003
 
THE BOEING COMPANY (1)
* 2005/0203,657 SYSTEMS AND METHODS ENABLING AUTOMATED RETURN TO AND/OR REPAIR OF DEFECTS WITH A MATERIAL PLACEMENT MACHINE 11 2004
 
JDA SOFTWARE GROUP, INC (12)
* 7260550 System and method for multi-enterprise supply chain optimization 26 1999
7373323 Method and system for multi-enterprise optimization using flexible trade contracts 7 2000
8214250 System and method for multi-enterprise supply chain optimization 2 2006
7720747 Method and system for multi-enterprise optimization using flexible trade contracts 1 2007
7720748 Method and system for multi-enterprise optimization using flexible trade contracts 1 2007
7774265 Method and system for multi-enterprise optimization using flexible trade contracts 0 2007
* 2008/0040,289 Method and System for Multi-Enterprise Optimization Using Flexible Trade Contracts 0 2007
* 8965539 System and method for a demand driven lean production control system 1 2009
* 2010/0083,160 System and Method for a Demand Driven Lean Production Control System 4 2009
* 8015104 Method and system for multi-enterprise optimization using flexible trade contracts 0 2010
* 8005751 Method and system for multi-enterprise optimization using flexible trade contracts 0 2010
* 2011/0125,625 Method and System for Multi-Enterprise Optimization Using Flexible Trade Contracts 1 2010
 
UNIVERSITY OF CENTRAL FLORIDA RESEARCH FOUNDATION, INC. (1)
* 5671361 Priority rule search technique for resource constrained project scheduling 69 1995
 
TEXAS INSTRUMENTS INCORPORATED (3)
* 5586021 Method and system for production planning 82 1992
* 5826040 Method and system for production planning 55 1995
* 2003/0171,972 Scheduling system and method 16 2003
 
MATSUSHITA ELECTRIC INDUSTRIAL CO., LTD. (2)
* 5946663 Method of planning a production schedule and an apparatus for planning a production schedule 24 1996
* 6122621 Method and system for progress management assistance 12 1997
 
AT&T CORP. (2)
* 6041288 Method and apparatus for evaluating power equipment 3 1998
* 7356376 Work when ready load balancing using critical dates 5 2005
 
W.W. GRAINGER, INC. (4)
7313534 System and method for predictive maintenance and service parts fulfillment in a supply chain 23 2001
7212976 Method for selecting a fulfillment plan for moving an item within an integrated supply chain 55 2001
* 2002/0143,598 System for providing integrated supply chain management 60 2001
* 2002/0138,358 Method for selecting a fulfillment plan for moving an item within an integrated supply chain 56 2001
* Cited By Examiner