Neural network system and method for factory floor scheduling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 5432887
SERIAL NO

08031954

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods are developed on a digital computer for performing work order scheduling activity in a dynamic factory floor environment, in a manner which enables scheduling heuristic knowledge from a scheduler to be encoded through an adaptive learning process, thus eliminating the need to define these rules explicitly. A sequential assignment paradigm incrementally builds up a final schedule from a partial schedule, assigning each work order to appropriate resources in turns, taking advantage of the parallel processing capability of neural networks by selecting the most appropriate resource combination (i.e. schedule generation) for each work order under simultaneous interaction of multiple scheduling constraints.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SINGAPORE COMPUTER SYSTEMS LIMITED750D CHAI CHEE ROAD #03-01 CHAI CHEE INDUSTRIAL PARK SINGAPORE 1646

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Khaw, Fook C Singapore, SG 1 47

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation