Discrete-event simulation-based method for staffing highway maintenance crews

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 5617342
SERIAL NO

08337886

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A maintenance management system is disclosed for staffing highway maintenance crews using discrete-event simulation and optimization techniques. Conveniently, the system is organized in four stages; making determinations, model building, simulation model, and experimentation and analysis. Determinations support setting agency's own standards regarding maintenance including identifying maintenance specialities, establishing standard crews, setting standard productivity rates, estimating optimum maintenance workloads, estimating costs of delaying maintenance, and deciding the planning period. Model building involves outlining the repair request system including highway system configuration, organization structure, crew assignments, input data, and maintenance model. The simulation model executes an initialization routine and events and runs the events through a time and event schema until the event queue in the simulator is emptied. The experimentation and analysis stage includes designing experiments, generating data, and employing optimization techniques to determine the optimum size of the maintenance staff.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELAZOUNI ASHRAF MNot Provided

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Elazouni, Ashraf M 1, Farakha St., Elmontaza, Zagazig, EG 1 45

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation