Method of scheduling successive tasks

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 5826080
SERIAL NO

08510343

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of scheduling tasks subject to timing and succession constraints essentially comprises grouping the tasks in layers according to succession constraints and scheduling the tasks layer by layer in increasing layer order up to the last layer, if possible, and then deciding that the resulting scheduling succeeds. If the scheduling achieved in a layer other than the first layer does not satisfy one or more constraints applying to a task belonging to the current layer, the method reschedules a layer containing a predecessor task corresponding to an unsatisfied constraint, schedules or reschedules all the other layers higher than the layer of the predecessor task, up to the last layer, if possible, and then decides that the resulting scheduling succeeds. Applications include scheduling of transmission of information on an industrial data bus.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CEGELECFRENCH IEVA LUVA LEVALLOIS-PERRET HAUTS-DE-SEINE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dworzecki, Jozef Fontenay Le Fleury, FR 2 119

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation