Method for determining the performance components of a manufacturing line

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 6259959
SERIAL NO

09148826

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for optimizing a manufacturing line comprises determining work center raw processing times of a plurality of work centers in the manufacturing line, summing the work center raw processing times to produce a manufacturing line raw processing time, determining work center cycle times of the work centers, dividing the work center cycle times by respective ones of the work center raw processing times to produce work center X-factors, weighting each of the work center X-factors by a percentage that a corresponding one of the work center raw processing times represents of the manufacturing line raw processing time to produce X-factor contributions for each of the work centers and modifying at least one work center of the work centers having an X-factor contribution higher than others of the X-factor contributions to reduce the X-factor contribution of the at least one work center.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Martin, Donald P Essex Junction, VT 9 163

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation