Hydroelectric installation and method of constructing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 6281597
SERIAL NO

09373679

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydroelectric power installation including a pre-existing gated spillway with upstream bulkhead slots and bulkhead service crane and hydroelectric generating modules configured to fit the existing upstream bulkhead slots. Each module including a plurality of turbines, generators, and associated switchgear. The installation may include a trash rake operated on the pre-existing bulkhead service craneway. The hydroelectric installation is configured to meet all of the original navigation project design criteria including generating modules that can be raised above flood water as high as the associated radial gates and that are able to be safely lowered in front of a failed radial gate to serve as the emergency bulkhead the slots for which the modules exclusively occupy.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SYNDICATED TECHNOLOGIES LLC115 AABC ASPEN CO 81611

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dum, Thomas Salzburg, AT 1 25
Obermeyer, Henry K Wellington, CO 48 848
Sambs, Wolfgang Linz, AT 1 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation