Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 6415194
SERIAL NO

09285286

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method of scheduling demand for a manufacturing resource in response to a customer order for a product is provided. The system and method includes means for tracking scheduled finished goods orders, existing finished goods inventory, past due finished goods orders, unallocated customer orders and marketing orders, and the manufacturing lead time for the product, among other manufacturing process parameters. The customer order amount and the date requested for the order are entered, and depending on whether the date requested is inside, equal to or outside the manufacturing lead time, manufacturing resources are consumed from one or more of the scheduled finished goods orders, existing finished goods inventory, available to promise amounts, past due finished goods orders, unallocated customer orders, marketing orders, and high flex amounts.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AS IP HOLDCO, LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bonalumi, Roberto E Milan, IT 4 66
Colon, Victor A Kendall Park, NJ 4 66
Gleditsch, David B Loveland, CO 5 90
James, Sharon A Hamilton Square, NJ 4 66
Kulback, Barry L Clarksville, TN 4 66
Schrijnemakers, Guillaume J Meppel, NL 4 66

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation