
US Patent No: 6,510,369
Number of patents in Portfolio can not be more than 2000
Residential load shedding
Stats
-
Jan 21, 2003
Issued date -
Aug 24, 1999
filing date -
09/379,655
serial no -
In Force
status
Importance
Loading Importance Indicators...
Abstract
A system includes a fuel cell subsystem, switches and a controller. The fuel cell subsystem is adapted to provide power that is capable of being consumed by residential loads, and the fuel cell subsystem is sized to provide power up to a first power threshold that is less than a maximum power threshold that is capable of being consumed by the residential loads. The controller is adapted to determine the power that is consumed by the residential loads and based on the determined power, operate the switches to selectively regulate electrical connections between the residential loads and the fuel cell subsystem to keep the power approximately below the first power threshold.
Loading the Abstract Image...
First Claim
Related Publications
Loading Related Publications...
International Classification(s)
- [Classification Symbol]
- [Patents Count]
Cited Art
| Patent Info | (Count) | # Cites | Year |
|---|---|---|---|
|
|
|||
| 5,880,677 System for monitoring and controlling electrical consumption, including transceiver communicator control apparatus and alternating current control apparatus | 165 | 1996 | |
| 6,311,105 Multi-utility energy control system | 100 | 1998 | |
|
|
|||
| 4,202,933 Method for reducing fuel cell output voltage to permit low power operation | 23 | 1978 | |
| 4,251,736 Method for controlling power flow between an electrochemical cell and a power grid | 40 | 1979 | |
|
|
|||
| 5,754,445 Load distribution and management system | 32 | 1995 | |
|
|
|||
| 5,880,536 Customer side power management system including auxiliary fuel cell for reducing potential peak load upon utilities and providing electric power for auxiliary equipment | 24 | 1997 | |
|
|
|||
| 5,534,734 Power shedding device | 54 | 1993 | |
|
|
|||
| 4,551,812 Energy controller and method for dynamic allocation of priorities of controlled load curtailment to ensure adequate load sharing | 31 | 1982 | |
|
|
|||
| 4,961,151 Fuel cell/battery control system | 49 | 1989 | |
|
|
|||
| 4,337,401 Adaptive load shedding | 26 | 1981 | |
|
|
|||
| 6,067,482 Load shifting control system for commercial refrigeration | 38 | 1999 | |
|
|
|||
| 4,771,185 Power adapter for electrical installations and especially domestic installations | 52 | 1986 | |
|
|
|||
| 4,217,646 Automatic control system for a building | 88 | 1978 | |
|
|
|||
| 5,477,091 High quality electrical power distribution system | 150 | 1992 | |
|
|
|||
| 4,644,320 Home energy monitoring and control system | 99 | 1984 | |
|
|
|||
| 5,432,710 Energy supply system for optimizing energy cost, energy consumption and emission of pollutants | 136 | 1993 | |
Patent Citation Ranking
Maintenance Fees
| Fee | Large entity fee | small entity fee | micro entity fee | due date |
|---|---|---|---|---|
| 11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jul 21, 2014 |
| Fee | Large entity fee | small entity fee | micro entity fee |
|---|---|---|---|
| Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
| Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
| Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |