
US Patent No: 6,582,539
Number of patents in Portfolio can not be more than 2000
Method for making large composite structures without use of an autoclave
Stats
-
Jun 24, 2003
Issued date -
Jun 8, 2001
filing date -
09/877,855
serial no -
In Force
status
Importance
Abstract
A method for fabrication or production of composite structures, which has particular advantages when fabricating large structures, includes the steps of procuring a composite panel, such as carbon-fiber-reinforced resin. The edge of the composite panel its adhesively fixed in the slot of a bifurcated metallic piece. After the composite panel is adhesively fixed to the metallic piece, the metallic piece is stir-friction welded to another metal piece. The stir-friction welding occurs at a lower temperature than fusion welding, and so the adhesive bond between the metallic element and the composite panel is less affected. When two composite panels are each adhesively fastened to a metallic element, the two metallic elements can, in turn, be stir-friction welded. Thus, large panels can be fabricated.
First Claim
Related Publications
International Classification(s)
- [Classification Symbol]
- [Patents Count]
Cited Art
| Patent Info | (Count) | # Cites | Year |
|---|---|---|---|
|
|
|||
| 6,193,137 Constructive body and friction stir welding method | 59 | 1998 | |
| 6,354,483 Friction stir welding method | 11 | 2000 | |
| 6,378,754 Friction stir welding method including removal of protruding portion, and structural body formed thereby | 12 | 2001 | |
| 6,382,498 Friction stir welding method including positioning of rotary tool, and structural body formed thereby | 15 | 2001 | |
|
|
|||
| 6,045,027 Friction stir welding interlocking joint design and method | 49 | 1998 | |
Patent Citation Ranking
Maintenance Fees
| Fee | Large entity fee | small entity fee | micro entity fee | due date |
|---|---|---|---|---|
| 11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Dec 24, 2014 |
| Fee | Large entity fee | small entity fee | micro entity fee |
|---|---|---|---|
| Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
| Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
| Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |