US Patent No: 6,737,182

Number of patents in Portfolio can not be more than 2000

Heated interconnect

ALSO PUBLISHED AS: 20030003339
1 Status Updates

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solid oxide fuel cell stack is disclosed. The solid oxide fuel cell stack comprises an electrochemical cell having an electrolyte disposed between and in ionic communication with a first electrode and a second electrode. The solid oxide fuel cell stack also comprises at least one interconnect disposed in fluid and thermal communication with at least a portion of the electrochemical cell, the interconnect comprising an electrical supply connector.

Loading the Abstract Image... loading....

First Claim

See full text

all claims..

Related Publications

Loading Related Publications... loading....

Patent Owner(s)

Patent OwnerAddressTotal Patents
DELPHI TECHNOLOGIES, INC.TROY, MI5124

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Keegan, Kevin R Hilton, NY 45 276

Cited Art Landscape

Patent Info (Count) # Cites Year
 
ARCH DEVELOPMENT CORPORATION (1)
4,883,497 Formation of thin walled ceramic solid oxide fuel cells 59 1988
 
DELPHI TECHNOLOGIES, INC. (1)
2002/0004,155 Etched interconnect for fuel cell elements 5 2001
 
Lockheed Idaho Technologies Company (1)
5,641,585 Miniature ceramic fuel cell 88 1995

Patent Citation Ranking

Forward Cite Landscape

Patent Info (Count) # Cites Year
 
NISSAN MOTOR CO., LTD. (1)
7,157,169 Fuel cell 1 2002
 
SAINT-GOBAIN CERAMICS & PLASTICS, INC. (1)
8,846,270 Titanate and metal interconnects for solid oxide fuel cells 0 2013

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 18, 2015
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00