
US Patent No: 6,751,833
Number of patents in Portfolio can not be more than 2000
Method of manufacturing laminated capacitors
Stats
-
Jun 22, 2004
Issued date -
Apr 23, 2001
filing date -
09/839,264
serial no -
Expired
status
Importance
Loading Importance Indicators...
Abstract
A method of manufacturing a laminated electrolytic capacitor by forming a dielectric made of organic polymer or a composite dielectric made of organic polymer and an oxide of a conductive metal is disclosed. An insulating layer is formed on the conductor, and an electrode is formed on the dielectric layer to complete the capacitive element. Plural capacitor elements are laminated and bonded to outside connection terminals.
Loading the Abstract Image...
First Claim
Related Publications
Loading Related Publications...
International Classification(s)
- [Classification Symbol]
- [Patents Count]
Cited Art
| Patent Info | (Count) | # Cites | Year |
|---|---|---|---|
|
|
|||
| 5,119,274 Solid capacitor | 22 | 1990 | |
| 5,140,502 Solid electrolytic capacitors and method for manufacturing the same | 24 | 1991 | |
|
|
|||
| 5,741,599 Polyimide compositions for electrodeposition and coatings formed of the same | 8 | 1996 | |
|
|
|||
| 5,062,025 Electrolytic capacitor and large surface area electrode element therefor | 28 | 1990 | |
|
|
|||
| 5,212,402 Semiconductor device with integral decoupling capacitor | 63 | 1992 | |
|
|
|||
| 5,377,073 Stacked type solid electrolytic capacitor | 37 | 1993 | |
|
|
|||
| 4,805,074 Solid electrolytic capacitor, and method of manufacturing same | 57 | 1987 | |
Patent Citation Ranking
Maintenance Fees
| Fee | Large entity fee | small entity fee | micro entity fee | due date |
|---|---|---|---|---|
| 11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Dec 22, 2015 |
| Fee | Large entity fee | small entity fee | micro entity fee |
|---|---|---|---|
| Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
| Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
| Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |