One trip completion process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 6962203
APP PUB NO 20040188093A1
SERIAL NO

10395667

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process and assembly for completing and providing sand control in a subterranean well and/or fracturing and preventing proppant flowback in a subterranean formation in a single trip. One or more perforating gun assemblies are juxtaposed and secured to one or more screen assemblies. Once positioned in a well adjacent a subterranean formation of interest, the explosive charges in each perforating gun assembly are detonated so as to penetrate the well and formation thereby initiating fracturing. The penetrations and the annulus defined between the well and screen assembly are then packed with gravel. Well fluid may be pressurized to in excess of the formation pressure prior to detonation of the explosive charges so as to enhance formation fracturing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OWEN OIL TOOLS LP6316 WINDFERN HOUSTON TX 77040

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Funchess, Thomas A Hazlehurst, MS 1 63

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation