US Patent No: 7,058,587

Number of patents in Portfolio can not be more than 2000

System and method for allocating the supply of critical material components and manufacturing capacity

3 Status Updates

Stats

ATTORNEY / AGENT: (SPONSORED)
 

Importance

Loading Importance Indicators... loading....

Abstract

The present invention allocates the supply of critical components and manufacturing capacity by optimizing critical material planning decisions and dynamically allocating constrained materials using advanced substitution logic that considers alternate suppliers and supports product life cycle from design through end-of-life. The present invention may utilize unique synchronized allocations and matched sets logic. The synchronized allocations ensure that all materials necessary for production are available in the appropriate time-phased allocation before beginning production to minimize wasted production capacity and materials. The supply system may include various combination of components, including a Supply Planner, a Resource Optimizer, a Constraint Based Master Planner, a Product Change Analyzer, a Comparer, a Resource Requirements Planner, a Finite Resource Planner, a Customer Promiser, and an Interactive Master Scheduler. Another embodiment of the supply system includes a tool that allows users to define products using engineering specifications.

Loading the Abstract Image... loading....

First Claim

Related Publications

Loading Related Publications... loading....

Patent Owner(s)

Patent OwnerAddressTotal Patents
JDA SOFTWARE GROUPROCKVILLE, MD18

International Classification(s)

  • No International Classification to display

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Horne, Martin Richmond, CA 2 107

Cited Art

Patent Info (Count) # Cites Year
 
INTERNATIONAL BUSINESS MACHINES CORPORATION (4)
4,887,206 Automated system for estimating impact on inventory cost due to an engineering change to a component 58 1987
5,630,070 Optimization of manufacturing resource planning 216 1993
6,272,389 Method and system for capacity allocation in an assembly environment 26 1998
6,157,915 Method and apparatus for collaboratively managing supply chains 115 1998
 
ALGORITHMICS HOLDINGS, INC. (1)
5,148,365 Scenario optimization 240 1989
 
CATERPILLAR INC. (1)
5,193,065 System for requistioning and distributing material in a manufacturing environment 53 1990
 
GOOGLE INC. (1)
6,049,742 Projected supply planning matching assets with demand in microelectronics manufacturing 75 1997
 
MANHATTAN ASSOCIATES (1)
2002/0013,721 System, method and apparatus for integrated supply chain management 55 2001
 
MICROSOFT CORPORATION (1)
6,684,193 Method and apparatus for multivariate allocation of resources 39 1999
 
MRPONLINE.COM INC. (1)
6,625,616 Method and apparatus for material requirements planning 14 2000
 
NORTEL NETWORKS LIMITED (1)
5,963,919 Inventory management strategy evaluation system and method 132 1996
 
ORACLE INTERNATIONAL CORPORATION (1)
6,216,109 Iterative repair optimization with particular application to scheduling for integrated capacity and inventory planning 65 1997
 
QUALCOMM INCORPORATED (1)
6,086,619 Apparatus and method for modeling linear and quadratic programs 23 1996
 
TOSHIBA GLOBAL COMMERCE SOLUTIONS HOLDINGS CORPORATION (1)
6,006,196 Method of estimating future replenishment requirements and inventory levels in physical distribution networks 78 1997
 
Other [Check patent profile for assignment information] (3)
6,101,479 System and method for allocating company resources to fulfill customer expectations 34 1995
6,219,649 Methods and apparatus for allocating resources in the presence of uncertainty 63 1999
2002/0049,625 Artificial intelligence manufacturing and design 14 2001

Patent Citation Ranking

  • No Patent Citation Ranking to display

Forward Cites

Patent Info (Count) # Cites Year
 
SAP AG (43)
7,636,670 Method and computer program product that determine values of characteristic value combinations for use in the production of products 1 2002
8,050,957 Systems and methods for planning demand for configurable products 3 2004
8,050,958 Systems and methods for planning demand for configurable products 0 2004
7,778,857 System and method for service parts planning in a multi-echelon network 1 2005
7,373,212 Allocating products using classifications of orders for the products 1 2005
8,448,137 Software model integration scenarios 0 2005
8,407,664 Software model business objects 0 2005
8,402,426 Architectural design for make to stock application software 0 2005
8,396,731 Architectural design for service procurement application software 0 2005
8,380,553 Architectural design for plan-driven procurement application software 0 2005
8,370,794 Software model process component 0 2005
8,326,703 Architectural design for product catalog management application software 0 2005
8,327,319 Software model process interaction 1 2005
8,321,831 Architectural design for internal projects application software 2005
8,316,344 Software model deployment units 0 2005
8,027,857 Rough-cut manufacturing operations for use in planning 0 2006
8,442,850 Providing accounting software application as enterprise services 0 2006
8,438,119 Foundation layer for services based enterprise software architecture 0 2006
8,396,749 Providing customer relationship management application as enterprise services 0 2006
8,396,761 Providing product catalog software application as enterprise services 0 2006
8,326,702 Providing supplier relationship management software application as enterprise services 0 2006
8,321,832 Composite application modeling 2006
8,312,416 Software model business process variant types 0 2006
7,894,922 Structural transformation of execution-level manufacturing process routings into planning-level routings 1 2006
7,617,015 Generating planning-level time and capacity requirement formulas for manufacturing processes 2 2006
7,551,975 Consistency checking and repair of manufacturing operation groupings to be aggregated for use in planning 0 2006
8,447,657 Architectural design for service procurement application software 0 2007
8,401,936 Architectural design for expense reimbursement application software 0 2007
8,315,900 Architectural design for self-service procurement application software 0 2007
8,401,928 Providing supplier relationship management software application as enterprise services 0 2008
8,386,325 Architectural design for plan-driven procurement application software 0 2008
8,380,549 Architectural design for embedded support application software 0 2008
8,374,896 Architectural design for opportunity management application software 0 2008
8,352,338 Architectural design for time recording application software 0 2008
8,326,706 Providing logistics execution application as enterprise services 0 2008
8,321,250 Architectural design for sell from stock application software 2008
8,315,926 Architectural design for tax declaration application software 0 2008
8,401,908 Architectural design for make-to-specification application software 0 2008
8,321,306 Architectural design for selling project-based services application software 2008
8,321,308 Architectural design for manual invoicing application software 2008
8,311,904 Architectural design for intra-company stock transfer application software 0 2008
8,190,465 Make-to-specification process and data model 0 2008
8,095,407 System and method for service parts planning in a multi-echelon network 0 2010
 
INTERNATIONAL BUSINESS MACHINES CORPORATION (18)
7,904,350 Network-based supply chain management method 36 2001
7,529,686 Supply planning system and method utilizing constrained and unconstrained explosion and implosion of flagged demand statements 0 2002
7,783,534 Optimal method, system, and storage medium for resolving demand and supply imbalances 3 2003
7,840,449 Total inventory management 1 2004
7,613,536 Method for calculating a materials requirements plan for demands containing multiple demand dates and priorities 0 2006
7,590,461 Large scale supply planning 1 2006
7,590,463 Supply consumption optimization and multiple component utilization 0 2006
7,970,638 Planning parts demand coverage based on variable percentage of substitution parts 0 2006
8,019,635 Adaptive product configuration model 1 2008
8,244,391 Method for minimizing productivity loss while using a manufacturing scheduler 0 2008
7,778,860 Method for simultaneously considering customer support dates and customer request dates 0 2009
7,856,287 Large scale supply planning 1 2009
7,734,365 Supply consumption optimization and multiple component utilization 0 2009
8,140,412 Network-based supply chain management method 0 2009
8,086,506 Network-based supply chain management method 0 2009
8,275,677 Resolving demand and supply imbalances 0 2009
8,214,268 Resolving demand and supply imbalances 0 2009
8,239,237 Adaptive product configuration model 0 2011
 
ACCENTURE GLOBAL SERVICES LIMITED (8)
8,266,066 Maintenance, repair and overhaul management 1 2001
7,502,744 Performing predictive maintenance based on a predictive maintenance target 4 2001
7,461,008 Planning and scheduling modification of a configuration 3 2001
7,457,762 Optimization of management of maintenance, repair and overhaul of equipment in a specified time window 6 2001
7,457,763 Predictive maintenance system 3 2001
7,440,906 Identification, categorization, and integration of unplanned maintenance, repair and overhaul work on mechanical equipment 4 2001
7,987,108 Managing maintenance for an item of equipment 4 2006
7,895,047 Computerized predictive maintenance system and method 1 2009
 
AMAZON TECHNOLOGIES, INC. (6)
7,747,543 Dynamically determining actual delivery information for orders based on actual order fulfillment plans 4 2001
7,295,990 Generating current order fulfillment plans based on expected future orders 17 2001
8,374,922 Fulfillment network with customer-transparent costs 0 2006
8,005,761 Dynamically determining actual delivery information for orders based on actual order fulfillment plans 0 2007
8,121,876 Generating current order fulfillment plans based on expected future orders 3 2007
8,428,988 Generating current order fulfillment plans to influence expected future conditions 0 2012
 
JDA SOFTWARE GROUP, INC (5)
7,672,862 Generating a supply chain plan 5 2001
8,117,059 Pull planning for serviceable parts to facilitate on-demand repair planning 0 2002
7,277,862 Push planning for unserviceable parts to facilitate repair planning in a repair network 2 2002
7,711,593 Pull planning for unserviceable parts in connection with on-demand repair planning 0 2003
7,856,371 Pull planning for unserviceable parts in connection with on-demand repair planning 0 2008
 
TEXAS INSTRUMENTS INCORPORATED (2)
7,426,419 Scheduling system and method 1 2003
7,574,278 Scheduling system and method 0 2008
 
WEBPLAN INC. (2)
7,698,348 Extended database engine providing versioning and embedded analytics 2 2004
8,015,044 System and method for determining a promise date for a demand in a business environment 1 2007
 
ASSET TRUST, INC. (1)
7,970,640 Purchasing optimization system 0 2002
 
AT&T MOBILITY II LLC (1)
8,332,258 Business to business dynamic pricing system 0 2007
 
BALANCEDFLOW SUPPLY CHAIN SOLUTIONS, LLC (1)
7,877,301 System and method for managing manufacturing, ordering, and distribution in a supply chain 0 2006
 
FORD MOTOR COMPANY (1)
8,428,985 Multi-feature product inventory management and allocation system and method 0 2009
 
GOOGLE INC. (1)
7,289,968 Forecasting demand for critical parts in a product line 8 2001
 
HON HAI PRECISION INDUSTRY CO., LTD. (1)
7,461,019 System and method for integration of material costs of a product 0 2003
 
ICON-SCM AG (1)
7,974,720 Dynamic fulfillment planning method and apparatus 0 2008
 
JDA SOFTWARE GROUP (1)
7,668,761 System and method for ensuring order fulfillment 38 2001
 
KINAXIS INC. (1)
7,610,212 System and method for determining a demand promise date based on a supply available date 5 2003
 
L'AIR LIQUIDE, SOCIETE ANONYME POUR L'ETUDE ET L'EXPLOITATION DES PROCEDES GEORGES CLAUDE (1)
7,873,429 Network production planning method 0 2005
 
ORACLE INTERNATIONAL CORPORATION (1)
8,170,899 Supply chain reservation 0 2002
 
TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY, LTD. (1)
7,209,887 Auto allocation swap system 3 2002
 
THE BOEING COMPANY (1)
8,229,791 Methods, systems, and computer integrated program products for supply chain management 0 2006
 
Other [Check patent profile for assignment information] (1)
8,452,438 Method for minimizing productivity loss while using a manufacturing scheduler 0 2012

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2013
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2017
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00