Method and system for performing operations on a wind turbine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 7735808
APP PUB NO 20070200103A1
SERIAL NO

11638863

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wind turbine has a nacelle frame and a first hoist substantially permanently mounted on the frame. The method comprises the processes of hoisting a second, more powerful hoist and crane on the frame with the first hoist; removably mounting the second hoist and the crane on the nacelle frame; hoisting a winch using the second hoist and the crane on the frame, and removably mounting the winch on said frame; performing operations involving handling heavy parts employing said winch; and removing and lowering said winch, crane, and second hoist from the frame.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE RENEWABLE TECHNOLOGIES WIND B VBERGSCHOT 69/2 4817 PA BREDA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lafuente, Sebastian Valero Barcelona, ES 1 15
Viladomiu, i Guarro Pere Barcelona, ES 2 46

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation