
US Patent No: 7,886,553
Number of patents in Portfolio can not be more than 2000
Method and a control unit for controlling a power level
Stats
-
Feb 15, 2011
Issued date -
Sep 27, 2006
filing date -
11/527,933
serial no -
In Force
status
Importance
Abstract
A method and a control unit for controlling a power level being drawn from a power source (26). Based on a determined rate of change of a measured voltage (1) an estimated remaining runtime is calculated. The estimated remaining runtime represents a time where specific run criteria will no longer be fulfilled if the present power level is maintained. The estimated remaining runtime is compared to a threshold value, and in case the estimated remaining runtime is shorter than the threshold value, the power drawn from the power source (26) is decreased. Thereby the runtime for the power source (26) is maximised. This is particularly useful if the power source is a limited power source, such as a battery (26), e.g. for running a compressor (27) for a movable refrigeration system (24). The invention is suitable for automotive applications.
First Claim
Related Publications
International Classification(s)
- [Classification Symbol]
- [Patents Count]
Cited Art
| Patent Info | (Count) | # Cites | Year |
|---|---|---|---|
|
|
|||
| 6,253,563 Solar-powered refrigeration system | 16 | 1999 | |
| 6,453,693 Solar powered refrigeration system | 6 | 2001 | |
| 6,469,487 Solar-powered refrigeration system | 4 | 2001 | |
| 2002/0020,181 Solar-powered refrigeration system | 2 | 2001 | |
|
|
|||
| 6,240,737 Solar-powered refrigerator | 1 | 2000 | |
|
|
|||
| 5,223,397 Soluble HLA cross-match | 18 | 1991 | |
|
|
|||
| 6,117,678 Method for determining maturity of conifer somatic embryos | 13 | 1999 | |
|
|
|||
| 7,353,084 Generator controller | 3 | 2004 | |
Patent Citation Ranking
Maintenance Fees
| Fee | Large entity fee | small entity fee | micro entity fee | due date |
|---|---|---|---|---|
| 3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Aug 15, 2014 |
| 7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Aug 15, 2018 |
| 11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Aug 15, 2022 |
| Fee | Large entity fee | small entity fee | micro entity fee |
|---|---|---|---|
| Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
| Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
| Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
| Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
| Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |