US Patent No: 7,937,698

Number of patents in Portfolio can not be more than 2000

Extensible mechanism for automatically migrating resource adapter components in a development environment

Stats

ALSO PUBLISHED AS: 20090037898
ATTORNEY / AGENT: (SPONSORED)
 

Importance

Loading Importance Indicators... loading....

Abstract

The illustrative embodiments provide a computer implemented method, apparatus, and computer usable program code for automatically migrating a resource adapter component. In one embodiment, information describing a development and runtime environment associated with a first version of a resource adapter is collected by a migration framework to form real environment information. A specification of requirements associated with a second version of the resource adapter is received from the second version of the resource adapter to form a required environment specification. The migration framework compares the real environment information with the required environment specification. In response to identifying incompatibilities between the real environment information and the required environment specification, the migration framework automatically executes a migration scenario to resolve the incompatibilities.

Loading the Abstract Image... loading....

First Claim

Related Publications

Loading Related Publications... loading....

Patent Owner(s)

Patent OwnerAddressTotal Patents
INTERNATIONAL BUSINESS MACHINES CORPORATIONARMONK, NY68180

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Belisario, Ella Toronto, CA 3 2
Lacombe, Jason Nathaniel San Francisco, CA 9 2
Loghin, Adriana M Boca Raton, FL 5 0
Patel, Pravesh Kirit - 2 0
Semenov, Vadim S - 2 0
Vidyarthi, Suraksha Newark, CA 26 10

Cited Art

Patent Info (Count) # Cites Year
 
SUN MICROSYSTEMS, INC. (6)
6,721,777 Modular and portable deployment of a resource adapter in an application server 59 2000
6,976,061 Resource adapter and XML descriptor for use in a client server environment utilizing an enterprise information system 17 2000
7,036,110 Mechanism to manage the lifecycle of a resource adapter 22 2002
7,058,950 Callback event listener mechanism for resource adapter work executions performed by an application server thread 3 2002
2003/0204,740 Resource adapter with modular system management interface 3 2002
2003/0182,426 Apparatus and method of lazy connection transaction enlistment 9 2002
 
ORACLE INTERNATIONAL CORPORATION (4)
2003/0110,315 System and method for providing a java interface to an application view component 31 2002
7,493,628 Shared common connection factory 2 2003
2004/0034,859 Shared common connection factory 3 2003
2004/0078,495 System and method for implementing J2EE connector architecture 36 2003
 
INTERNATIONAL BUSINESS MACHINES CORPORATION (3)
7,480,916 Exploiting services in an integrated development environment 3 2002
2003/0074,217 Resource adapter and integrated development environment 54 2002
2006/0143,222 Method, program and system for automatic reengineering of a client code 1 2005
 
SAP AG (3)
7,509,429 Message endpoint activation 1 2004
7,657,658 Resource adapter deployment 1 2004
2006/0080,435 Resource adapter deployment 5 2004
 
BANK OF AMERICA CORPORATION (1)
2007/0011,194 Method and apparatus for data item movement between disparate sources and hierarchical, object-oriented representation 6 2006
 
DROPLET, INC (1)
6,687,745 System and method for delivering a graphical user interface of remote applications over a thin bandwidth connection 140 2000
 
NOKIA CORPORATION (1)
2006/0165,034 Cover resource adapter 1 2005

Patent Citation Ranking

Forward Cites

  • No Forward Cites to Display

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 3, 2014
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 3, 2018
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 3, 2022
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00