
US Patent No: 8,055,369
Number of patents in Portfolio can not be more than 2000
Optimized deployment of parts in a distribution network
Stats
-
Nov 8, 2011
Issued date -
Jan 8, 2010
filing date -
12/684,856
serial no -
In Force
status
Importance
Abstract
A method for deploying parts is disclosed. Locations that include supply locations and demand locations are defined. A supply location supplies parts to a demand location. A demand is computed for each part at each location. An availability lead-time is estimated for each part at each location. A lead-time demand is computed for each part at each location using the availability lead-times for the part. A stock level is computed for each part at each location. A completely filled demand is determined from the lead-time demands and the stock levels, and a partially filled demand is determined from the lead-time demands and the stock levels. A coverage function for the parts at the locations is generated from the completely filled demand and the partially filled demand.
First Claim
Related Publications
International Classification(s)
- [Classification Symbol]
- [Patents Count]
Cited Art
| Patent Info | (Count) | # Cites | Year |
|---|---|---|---|
|
|
|||
| 5,974,395 System and method for extended enterprise planning across a supply chain | 143 | 1996 | |
| 5,983,194 Planning coordination systems for coordinating separate factory planning systems and a method of operation | 59 | 1997 | |
| 6,486,899 System and method for displaying logistics information associated with a supply chain | 36 | 1999 | |
| 7,210,624 Redistribution of parts in a distribution network | 17 | 2001 | |
| 7,337,031 Optimized deployment of parts in a distribution network | 3 | 2001 | |
| 7,672,867 Optimized deployment of parts in a distribution network | 1 | 2007 | |
|
|
|||
| 5,630,070 Optimization of manufacturing resource planning | 216 | 1993 | |
| 5,970,465 Method for part procurement in a production system with constrained resources | 58 | 1997 | |
| 5,971,585 Best can do matching of assets with demand in microelectronics manufacturing | 88 | 1997 | |
| 6,078,900 Method for estimating stock levels in production-distribution networks with inventory control | 65 | 1998 | |
| 6,816,839 Demand planning for configure-to-order and building blocks-based market environment | 19 | 2000 | |
|
|
|||
| 5,265,006 Demand scheduled partial carrier load planning system for the transportation industry | 136 | 1990 | |
| 7,130,807 Technology sharing during demand and supply planning in a network-based supply chain environment | 242 | 1999 | |
|
|
|||
| 5,953,707 Decision support system for the management of an agile supply chain | 408 | 1997 | |
| 6,151,582 Decision support system for the management of an agile supply chain | 403 | 1997 | |
|
|
|||
| 6,061,691 Method and system for inventory management | 68 | 1998 | |
|
|
|||
| 5,819,232 Method and apparatus for inventory control of a manufacturing or distribution process | 136 | 1996 | |
|
|
|||
| 6,609,108 Communication schema of online system and method of ordering consumer product having specific configurations | 112 | 2000 | |
|
|
|||
| 6,094,603 Method of and apparatus for production management | 12 | 1996 | |
|
|
|||
| 6,684,180 Apparatus, system and method for reporting field replaceable unit replacement | 14 | 2001 | |
|
|
|||
| 5,611,051 Point of supply use distribution process and apparatus | 121 | 1995 | |
|
|
|||
| 7,519,444 Method and apparatus for scheduling work orders in a manufacturing process | 7 | 2006 | |
|
|
|||
| 7,003,474 Supply chain architecture | 77 | 2002 | |
|
|
|||
| 6,516,301 Order-based material management system | 28 | 1999 | |
|
|
|||
| 5,596,493 Method for classifying sale amount characteristics, method for predicting sale volume, method for ordering for restocking, system for classifying sale amount characteristics and system for ordering for restocking | 46 | 1992 | |
|
|
|||
| 7,363,249 Multiply-integrated system for product inventory, sales, and distribution | 13 | 2001 | |
|
|
|||
| 5,963,919 Inventory management strategy evaluation system and method | 132 | 1996 | |
|
|
|||
| 6,341,266 Method and system for the maximization of the range of coverage profiles in inventory management | 30 | 1998 | |
|
|
|||
| 6,205,431 System and method for forecasting intermittent demand | 90 | 1998 | |
|
|
|||
| 6,006,196 Method of estimating future replenishment requirements and inventory levels in physical distribution networks | 78 | 1997 | |
|
|
|||
| 6,611,755 Vehicle tracking, communication and fleet management system | 213 | 1999 | |
|
|
|||
| 6,493,679 Method and system for managing a real time bill of materials | 119 | 1999 | |
|
|
|||
| 6,954,734 Method of producing, selling, and distributing articles of manufacture | 40 | 2000 | |
|
|
|||
| 5,445,317 Mailbox flag structure | 12 | 1994 | |
| 6,725,204 System for facilitating the sale and shipment of cores | 40 | 2000 | |
Patent Citation Ranking
Maintenance Fees
| Fee | Large entity fee | small entity fee | micro entity fee | due date |
|---|---|---|---|---|
| 3.5 Year Payment | $1600.00 | $800.00 | $400.00 | May 8, 2015 |
| 7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | May 8, 2019 |
| 11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | May 8, 2023 |
| Fee | Large entity fee | small entity fee | micro entity fee |
|---|---|---|---|
| Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
| Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
| Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
| Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
| Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |