
US Patent No: 8,170,985
Number of patents in Portfolio can not be more than 2000
Primary stub file retention and secondary retention coordination in a hierarchical storage system
Stats
-
May 1, 2012
Issued date -
Jan 31, 2006
filing date -
11/343,313
serial no -
In Force
status
Importance
Abstract
A protected file is retained in secondary storage for a retention period, and a corresponding stub file is retained in primary storage for the retention period. The stub file retains attributes of the file indicating a location of the file data in the secondary storage and indicting that the stub file is to be retained for the retention period. A system administrator may instruct a primary file server that a secondary file server supports retention based protection and it is desired to protect stub files corresponding to protected files that are migrated to the secondary file server. The primary file server may request the secondary file server to return a protection status of the file after migration. This enables automatic policy-based migration to both file level retention (FLR) and non-FLR retention protected secondary storage from diverse applications accessing FLR or non-FLR files in the primary storage.
First Claim
Related Publications
International Classification(s)
- [Classification Symbol]
- [Patents Count]
Cited Art
| Patent Info | (Count) | # Cites | Year |
|---|---|---|---|
|
|
|||
| 5,893,140 File server having a file system cache and protocol for truly safe asynchronous writes | 187 | 1996 | |
| 5,901,327 Bundling of write data from channel commands in a command chain for transmission over a data link between data storage systems for remote data mirroring | 437 | 1997 | |
| 6,185,661 Worm magnetic storage device | 24 | 1998 | |
| 6,269,431 Virtual storage and block level direct access of secondary storage for recovery of backup data | 473 | 1998 | |
| 6,938,039 Concurrent file across at a target file server during migration of file systems between file servers using a network file system access protocol | 75 | 2000 | |
| 2006/0212,481 Distributed open writable snapshot copy facility using file migration policies | 26 | 2005 | |
| 2006/0212,746 Selection of migration methods including partial read restore in distributed storage management | 37 | 2005 | |
|
|
|||
| 5,835,954 Target DASD controlled data migration move | 141 | 1996 | |
| 6,023,709 Automated file error classification and correction in a hierarchical storage management system | 75 | 1997 | |
| 2006/0123,232 Method for protecting and managing retention of data on worm media | 7 | 2004 | |
| 2007/0106,710 Apparatus, system, and method for data migration | 6 | 2005 | |
|
|
|||
| 6,490,666 Buffering data in a hierarchical data storage environment | 39 | 1999 | |
| 6,804,719 Method and system for relocating files that are partially stored in remote storage | 34 | 2000 | |
| 6,757,794 Buffering data in a hierarchical data storage environment | 88 | 2002 | |
|
|
|||
| 5,963,962 Write anywhere file-system layout | 402 | 1998 | |
| 6,665,689 Backup and restore for heterogeneous file server environment | 31 | 2001 | |
|
|
|||
| 6,078,929 Internet file system | 112 | 1997 | |
|
|
|||
| 5,974,563 Real time backup system | 402 | 1998 | |
|
|
|||
| 5,596,706 Highly reliable online system | 65 | 1994 | |
Patent Citation Ranking
Maintenance Fees
| Fee | Large entity fee | small entity fee | micro entity fee | due date |
|---|---|---|---|---|
| 3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Nov 1, 2015 |
| 7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Nov 1, 2019 |
| 11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Nov 1, 2023 |
| Fee | Large entity fee | small entity fee | micro entity fee |
|---|---|---|---|
| Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
| Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
| Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
| Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
| Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |