
US Patent No: 8,175,035
Number of patents in Portfolio can not be more than 2000
Dynamic fractional frequency reuse in OFDMA networks
Stats
-
May 8, 2012
Issued date -
Oct 31, 2008
filing date -
12/263,236
serial no -
In Force
status
Importance
Loading Importance Indicators...
Abstract
A method allocates resources in an orthogonal frequency-division multiple access (OFDMA) network including a set of base stations (BSs), and a set of mobile stations (MSs) for each BS. Each cell includes a center and edge zone. A node weighted constraint graph is constructed for the network. Maximal independent sets in the graph are searched as sub-channels are allocated to the MSs in edge zones. Remaining bandwidth is allocated to the MSs in the center zones. Power is assigned to the sub-channels so that inter-cell interference is minimized and traffic load is maximized.
Loading the Abstract Image...
First Claim
Related Publications
Loading Related Publications...
International Classification(s)
- [Classification Symbol]
- [Patents Count]
Cited Art
| Patent Info | (Count) | # Cites | Year |
|---|---|---|---|
|
|
|||
| 2010/0208,687 METHOD OF PERFORMING UPLINK SCHEDULING | 1 | 2008 | |
|
|
|||
| 2010/0061,469 Graph-Based Method for Dynamic Fractional Frequency Reuse | 3 | 2008 | |
|
|
|||
| 8,095,134 Method and apparatus for handover measurement | 1 | 2007 | |
|
|
|||
| 2007/0177,501 Signaling Requirements to Support Interference Coordination in OFDMA Based Systems | 11 | 2007 | |
Patent Citation Ranking
Maintenance Fees
| Fee | Large entity fee | small entity fee | micro entity fee | due date |
|---|---|---|---|---|
| 3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Nov 8, 2015 |
| 7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Nov 8, 2019 |
| 11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Nov 8, 2023 |
| Fee | Large entity fee | small entity fee | micro entity fee |
|---|---|---|---|
| Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
| Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
| Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
| Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
| Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |