Semiconductor device including leadframe having power bars and increased I/O

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8188579
SERIAL NO

12965582

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In accordance with the present invention, there is provided a semiconductor package (e.g., a QFP package) including a uniquely configured leadframe sized and configured to maximize the available number of exposed leads in the semiconductor package. More particularly, the semiconductor package includes a generally planar die pad or die paddle defining multiple peripheral edge segments. In addition, the semiconductor package includes a plurality of leads. Some of these leads include bottom surface portions which, in the completed semiconductor package, are exposed and at least partially circumvent the die pad, with other leads including portions which protrude from respective side surfaces of a package body in the completed semiconductor package. The semiconductor package also includes one or more power bars and/or one or more ground rings which are integral portions of the original leadframe used to fabricate the same.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMKOR TECHNOLOGY SINGAPORE HOLDING PTE LTD491 B RIVER VALLEY ROAD VALLEY POINT #12/03 SINGAPORE 248373

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Yeon Ho Chandler, US 29 409
Kim, Gi Jeong Guri-si, KR 51 227

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2023
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00