Active matrix liquid crystal display device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8218100
APP PUB NO 20110147758A1
SERIAL NO

13034805

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An conductive coating serves as a light shield film and is kept at a give voltage. A metal interconnection is located in the same layer as a source line and connected to the drain of a thin-film transistor. An interlayer insulating film is constituted of at least lower and upper insulating layers and formed between the conductive coating and the source line. According to one aspect of the invention, an auxiliary capacitor is formed by the metal interconnection and the conductive coating serving as both electrodes and at least the lower insulating layer film serving as a dielectric. The auxiliary capacitor is formed in a region of the interlayer insulating film in which the upper insulating layer has been removed by etching. According to another aspect of the invention, the conductive coating has a portion that is in contact with the lower insulating layer in a region where the conductive coating coextends with the metal interconnection.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEMICONDUCTOR ENERGY LABORATORY CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirakata, Yoshiharu Kanagawa, JP 491 10371
Ogata, Yasushi Kanagawa, JP 70 2947
Ohtani, Hisashi Kanagawa, JP 444 21278

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 10, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00