Method and apparatus for reducing impurities in cellulose fibers for manufacture of fiber reinforced cement composite materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8268119
APP PUB NO 20120205060A1
SERIAL NO

13399854

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing high purity fiber cement grades of cellulose fibers is described. Additional washing steps, coupled with an elevated temperature, are used in the process to extensively wash the pulps and remove substantially all COD components remaining in the pulps. The pulps are counter-currently washed by diffusion and dewatering at elevated temperatures following the brown stock washer systems. During the additional washing steps, the pulps are soaked in counter-current heated water for a pre-determined time and some chemicals may be introduced to chemically break down the COD components in the pulps and to make them more soluble in the aqueous solution. The additional washing steps can be performed using existing equipment at conventional pulp mills.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JAMES HARDIE TECHNOLOGY LIMITEDHARCOURT CENTRE HARCOURT STREET EUROPA HOUSE SECOND FLOOR DUBLIN 2

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Luo, Caidian Alta Loma, US 37 799
Merkley, Donald J Alta Loma, US 27 956

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 18, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00