Motor control circuit, motor system, and motor control method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8305017
APP PUB NO 20100171452A1
SERIAL NO

12601755

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a motor control circuit which controls energization of a coil on the basis of a detection result of a rotor position, control is performed so that continuous rotation of the rotor by inertia is suppressed, rotation is stopped quickly, and reverse rotation of the rotor is prevented. When an external control signal CTL is changed from L to H, the normal rotation control is switched to reverse rotation control, and a reverse brake state is effected. When motor rotation speed is monitored and reduced to a set rotation speed, a brake control signal SPSB is changed from L to H, and a short brake state is effected. However, the motor continues to be rotated by its own inertia, and a position detection signal HALL is changed. Thus, reverse brake control is temporarily performed (only during a time period corresponding to a pulse width TRB). The short pulse reverse brake control is intermittently performed until the motor is completely stopped.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ASAHI KASEI EMD CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukushima, Takashi Tokyo, JP 114 1103

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 6, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00