Circuits and methods to produce a VPTAT and/or a bandgap voltage with low-glitch preconditioning

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8330445
APP PUB NO 20110084681A1
SERIAL NO

12861538

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided herein are circuits and methods to generate a voltage proportional to absolute temperature (VPTAT) and/or a bandgap voltage output (VGO) with low 1/f noise. A first base-emitter voltage branch is used to produce a first base-emitter voltage (VBE1). A second base-emitter voltage branch is used to produce a second base-emitter voltage (VBE2). The circuit also includes a first current preconditioning branch and/or a second current preconditioning branch. The VPTAT is produced based on VBE1 and VBE2. A CTAT branch can be used to generate a voltage complimentary to absolute temperature (VCTAT), which can be added to VPTAT to produce VGO. Which transistors are in the first base-emitter voltage branch, the second base-emitter voltage branch, the first current preconditioning branch, the second current pre-conditioning branch, and the CTAT branch changes over time. The current preconditioning branches are used to appropriately precondition transistors with an appropriate amount of current as they are switched into and out of the various other circuit branches.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERSIL AMERICAS LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Herbst, Steven G San Francisco, US 19 514

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 11, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00