3-phase high-power UPS

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8344551
APP PUB NO 20110280055A1
SERIAL NO

13192869

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A 3-phase uninterruptible power supply (UPS) including first, second, and third AC/DC converters, a DC/DC converter, and at least one DC/AC converter coupled to multiple electrical buses. The first, second, and third AC/DC converters each being configured to receive AC power and to provide multiple DC signals to the multiple electrical buses. The DC/DC converter being configured to convert DC voltages present on the multiple electrical buses to a DC voltage that can be used to charge a battery. The DC/AC converter being configured to receive DC power from the multiple electrical buses and to provide an AC output. The 3-phase UPS being configured such that when suitable AC power is provided to the AC/DC converters, the DC/DC converter is configured to charge a battery, and when suitable AC power is not provided to the AC/DC converters, the DC/DC converter is configured to provide DC power to the multiple electrical buses using power provided by the battery.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMERICAN POWER CONVERSION CORPORATION132 FAIRGROUNDS ROAD WEST KINGSTON RI 02892

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nielsen, Henning Roar Brenderup, DK 28 1103

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 1, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00