Combining multiple laser beams to form high repetition rate, high average power polarized laser beam

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8374206
APP PUB NO 20110267671A1
SERIAL NO

12934928

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Two pulsed lasers (14) or sets of lasers propagate beams of pulses (20) having orthogonally related polarization states. A beam combiner (24) combines the orthogonal beams to form a combined beam propagating along a common beam path (16) to intersect an optical modulator (30) that selectively changes the polarization state of selected pulses of either beam to provide a composite beam (18) including similarly polarized pulses from the orthogonal beams. The composite polarized beam has a composite average power and a composite repetition rate that are greater than those provided by either laser. The optical modulator can also selectively control the polarization states of pulses from either laser to pass through or be blocked by a downstream polarizer (32). Additional modulators may facilitate pulse shaping of the pulses. The system is scalable by addition of sets of single lasers or pairs of lasers with beam combiners and modulators.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ELECTRO SCIENTIFIC INDUSTRIES, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jordens, William J Beaverton, US 11 403
Peng, Xiaoyuan Portland, US 11 221

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 12, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00