Memory system and data transmission method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8375240
SERIAL NO

12270546

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A memory system of a high-speed operation can be realized by reducing an influence of reflection signals etc. caused by branching and impedance mismatching in various wirings between a memory controller and a memory module, and an influence due to transmission delays of data, command/address, and clocks in the memory module. To this end, a memory system comprises a memory controller and a memory module mounted with DRAMs. A buffer is mounted on the memory module. The buffer and the memory controller are connected to each other via data wiring, command/address wiring, and clock wiring. The DRAMs and the buffer on the memory module are connected to each other via internal data wiring, internal command/address wiring, and internal cock wiring. The data wiring, the command/address wiring, and the clock wiring may be connected to buffers of other memory modules in cascade. Between the DRAMs and the buffer on the memory module, high-speed data transmission is implemented using data phase signals synchronous with clocks.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PS4 LUXCO S.A.R.L.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsui, Yoshinori Tokyo, JP 179 3916

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 12, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00