Blowoff tank

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8381770
APP PUB NO 20100147393A1
SERIAL NO

12600486

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A blowoff tank (B) for receiving blowdown, blowoff, and drain water from an HRSG (C) or other type of boiler, so as to lower the temperature of that water enough to enable it to be discharged into a sewer system, includes a generally cylindrical vessel (50) and inlet pipes (60) through which the blowdown, blowoff, and drain water is introduced into the vessel. Each pipe has a radial segment (62) that passes through the sidewall (52) of the vessel, a generally vertical segment (64) that extends upwardly within the vessel, and a tangential segment (68) that opens into the vessel. The radial segment contains a small drain aperture (74). The tank also has a cooling line (90) through which cooling water is introduced into the vessel to lower the temperature of the blowdown, blowoff, and drain water in the vessel and a drain line (86) that drains the mixture of cooling water and blowdown, blowoff, and drain water from the vessel, but never exceeds the elevation of the apertures in the inlet pipes. Thus, once blowdown, blowoff, and draining are completed, water will drain from the inlet pipes and from lines connected to them, all into vessel and thereby reduce a source of corrosion and a cause of water hammer in the lines.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NOOTER/ERIKSEN, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Schroeder, Joseph E Union, US 7 41

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 26, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00