System and method for TCP/IP offload independent of bandwidth delay product

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8402142
APP PUB NO 20080095182A1
SERIAL NO

11963105

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for providing TCP/IP offload may include receiving control of at least a portion of Transmission Control Protocol (TCP) connection variables by a TCP/IP Offload Engine operatively coupled to a host. The at least a portion of the TCP/IP Offload Engine connection variables may be updated and provided to the host. The TCP/IP Offload Engine may receive control of segment-variant TCP connection variables. The TCP/IP Offload Engine may update the received TCP segment-variant TCP connection variables, and communicate the updated TCP segment-variant TCP connection variables to the host. A system for providing connection offload may include a TCP/IP Offload Engine that receives control of state information for a particular connection offloaded to a network interface card (NIC). Control of the state information for the particular connection may be split between the NIC and a host.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AVAGO TECHNOLOGIES GENERAL IP (SINGAPORE) PTE. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Elzur, Uri Irvine, US 91 3199
Fan, Frankie Diamond Bar, US 15 567
Lindsay, Steven B Mission Viejo, US 41 1268
McDaniel, Scott S Villa Park, US 28 1321

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 19, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00