Method for managing hydrates in subsea production line

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8430169
APP PUB NO 20100193194A1
SERIAL NO

12670994

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for managing hydrates in a subsea production system is provided. The production system includes a host production facility, a control umbilical, at least one subsea production well, and a single production line. The method generally comprises producing hydrocarbon fluids from the at least one subsea production well and through the production line, and then shutting in the production line. In addition, the method includes the steps of depressurizing the production line to substantially reduce a solution gas concentration in the produced hydrocarbon fluids, and then repressurizing the production line to urge any remaining gas in the free gas phase within the production line back into solution. The method also includes displacing production fluids within the production line by moving displacement fluids from a service line within the umbilical line and into the production line. The displacement fluids preferably comprise a hydrocarbon-based fluid having a low dosage hydrate inhibitor (LDHI).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • EXXONMOBIL UPSTREAM RESEARCH COMPANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cai, Jiyong Katy, US 3 21
Lucas, David C The Woodlands, US 4 63
Shatto, Donald P Houston, US 6 53
Stoisits, Richard F Kingwood, US 11 274
Talley, Larry D Friendswood, US 17 200

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 30, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00