Method of production of cement bonded agglomerated ore

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8435439
APP PUB NO 20110037206A1
SERIAL NO

12736362

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of production of cement bonded agglomerated ore not depending on yard curing which can improve the environment, save labor, and improve yield is provided, that is, a method of production of cement bonded agglomerated ore which adds Portland cement as a binder to dust produced from an iron works and/or fine powder ore, treats the same by mixing, moisture adjustment, and kneading steps, then pelletizes it by a pan pelletizer and suitably thereafter cures it to produce blast furnace-use cold pellets or sintering-use minipellets having the required crushing strength, which method charges the raw pellets from the top of a vertical type container and discharges them from the bottom end to form a moving bed and cures the raw pellets in the period from charging to discharging.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TETSUGEN CORPORATION4-4 FUJIMI 1-CHOME CHIYODA-KU TOKYO 1028142

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kubo, Mitsumasa Kimitsu, JP 25 289
Majima, Syuji Kimitsu, JP 1 0
Uekawa, Seita Tokyo, JP 4 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 7, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00